AECOM picked as lead designer for Ottawa-Gatineau Alexandra Bridge replacement project
إيكوم تكنولوجي كوربوريشن
AECOM ACM | 0.00 |
- AECOM was selected as lead designer for the Alexandra Bridge replacement linking Ottawa, Ontario, with Gatineau, Quebec.
- The mandate covers the project’s development phase, including design and engineering work, traffic management, utility coordination, and public consultation support.
- The bridge replacement will use building information modeling and digital project delivery tools.
- The contract was awarded by Capital Crossing Constructors, a joint venture of Webuild, Samsung C&T, and Green Infrastructure Partners.
Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. AECOM published the original content used to generate this news brief via Business Wire (Ref. ID: 202607070655BIZWIRE_USPR_____20260707_BW966140) on July 07, 2026, and is solely responsible for the information contained therein.
