Armstrong installs Templok PCM ceiling tiles at Arizona elementary school retrofit in Coolidge, Arizona

Armstrong World Industries, Inc.

Armstrong World Industries, Inc.

AWI

0.00

  • Armstrong World Industries detailed a drop-in retrofit at Arizona Elementary School in Coolidge, Arizona, using Templok ceiling tiles with phase-change material.
  • The installation targets large day-night temperature swings that drive peak cooling demand in desert-climate classrooms under uninsulated roof areas.
  • Performance data cited peak heat absorption of about 7 BTUs per hour per square foot around noon, reducing HVAC peak load.
  • The tiles integrate into existing ceiling grids without ductwork or control changes, positioning the product as a low-disruption energy-saving upgrade.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Armstrong World Industries Inc. published the original content used to generate this news brief on May 28, 2026, and is solely responsible for the information contained therein.