Emperor Metals hits 35.9 m at 3.1 g/t gold at Globex-optioned Duquesne West project
- Globex Mining reported Emperor Metals hit 35.9 meters at 3.1 g/t gold in hole DQ26-45 at Duquesne West.
- Intercept sits below the current main-pit shell, about 75–80 meters down dip from a 2002 hole that returned 13.4 meters at 4.9 g/t.
- 2026 work combines 15,000 meters of new drilling with 8,000 meters of historic core resampling to update the geological model.
- Assays received cover 16 of 47 holes drilled so far; about 20% of expected 2025–26 assays have been reported.
- Program completed about 15,300 meters to date, with drilling still running below budget.
Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Globex Mining Enterprises Inc. published the original content used to generate this news brief on June 03, 2026, and is solely responsible for the information contained therein.
