Green Bridge Metals reports initial copper assays from Titac South drill program in Minnesota

  • Green Bridge Metals reported initial assays from its Phase 1 diamond drilling at the Titac Project in northeastern Minnesota.
  • Six holes were completed at Titac South; visible sulphide mineralization was logged in all holes, with assays pending for three holes.
  • Best reported intercepts included TS26-005 with 152 m at 0.31% Cu, 13.7% TiO2, 0.15% V2O5.
  • TS26-003 returned 190 m at 0.30% Cu, 11.4% TiO2, 0.13% V2O5, including 14 m at 0.48% Cu.
  • Work is testing copper distribution within a Titac South inferred resource of 46.6 million tonnes at 15% TiO2.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Green Bridge Metals Corporation published the original content used to generate this news brief via ACCESS Newswire (Ref. ID: 202605271700ACCESSWRNAPR_____1171156) on May 27, 2026, and is solely responsible for the information contained therein.