Jacobs wins owner’s engineer role on Tilt Renewables’ 288-MW Palmer Wind Farm in South Australia
جاكوبس إنجنيرينغ
Jacobs Solutions Inc. J | 0.00 |
- Jacobs won the owner’s engineer role for Tilt Renewables’ 288-MW Palmer Wind Farm near Adelaide, South Australia.
- Scope covers delivery-phase oversight, including design reviews, construction monitoring, grid-connection support, site inspections.
- Project includes 407.2 MW of wind turbine generators, linking to the grid at 275 kV via two new substations.
- Construction is set to start in 2026, with completion expected in 2028.
Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Jacobs Solutions Inc. published the original content used to generate this news brief via Business Wire (Ref. ID: 20260702558496) on July 02, 2026, and is solely responsible for the information contained therein.
