Nexans completes factory tests for Malta-Sicily power interconnector cable order
NEXUS BIOPHARMA INC
NEXUS BIOPHARMA INC NEXS | 0.00 |
- Nexans completed manufacturing and factory acceptance tests for the high-voltage subsea cable for Malta’s second Malta-Sicily interconnector.
- Scope covers design, production, delivery of 100 km of subsea cable, plus 4 km of spare cable.
- Second interconnector targets a 225 MW HVAC link over about 122 km between Malta and Sicily.
- Factory testing finished just over 13 months after contract signing, clearing the cable for shipment and installation.
Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Nexans SA published the original content used to generate this news brief on June 29, 2026, and is solely responsible for the information contained therein.
