Scorpio Gold drills 0.58 g/t gold over 18.04 m at Black Mammoth, Manhattan project in Nevada

Signing Day

Signing Day

SGN

0.00

  • Scorpio Gold reported Phase Two step-out drilling hits at the Black Mammoth target within its Manhattan District Project in Nevada.
  • Hole 26MN-078 intersected 0.58 g/t gold over 18.04 meters from 311.05 meters within Manhattan Caldera volcanic units.
  • Hole 26MN-088 returned 0.35 g/t gold over 17.4 meters from 185.96 meters, with a higher-grade 1.85 g/t over 3.14 meters.
  • Both holes were drilled about 50 meters from prior drilling, targeting mineralization beyond the inferred resource pit constraint.
  • Phase Two drilling totals 91 holes for 25,838 meters; assays remain pending for 18 holes covering 3,876 meters.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Scorpio Gold Corporation published the original content used to generate this news brief via Newsfile (Ref. ID: 202606020500NEWSFILECNPR____20260602_299793_1) on June 02, 2026, and is solely responsible for the information contained therein.