Scorpio Gold drills 2.05 g/t gold over 98 m at Goldwedge target in Manhattan project, Nevada

Signing Day

Signing Day

SGN

0.00

  • Scorpio Gold reported Phase Two step-out drilling results from its Manhattan District Project in Nevada, highlighting a broad Goldwedge intercept.
  • Hole 26MN-110 returned 2.05 g/t gold over 97.99 meters from 64.16 meters, including 18.19 g/t over 3.17 meters.
  • Additional higher-grade intervals within the same hole included 11.41 g/t over 4.57 meters and 8.98 g/t over 7.32 meters.
  • Along the Zanzibar Trend, hole 26MN-099 returned 2.1 g/t over 16.15 meters from 126.95 meters, including 2.91 g/t over 10.27 meters.
  • Phase Two drilling totals 102 holes for 28,939 meters; assays have been reported for 99 holes, with results pending for three holes.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Scorpio Gold Corporation published the original content used to generate this news brief on July 14, 2026, and is solely responsible for the information contained therein.