Scorpio Gold hits 2.68 g/t gold over 11.34 m at Manhattan, Nevada
Signing Day
Signing Day SGN | 0.00 |
- Scorpio Gold reported new Phase Two drill results from its Manhattan District Project in Nevada, extending the Zanzibar Trend beyond the current inferred resource constraining pit.
- Hole 26MN-071 intersected 2.68 g/t gold over 11.34 meters from 0.76 meters depth, including 6.54 g/t over 3.41 meters.
- Hole 26MN-070 returned 0.69 g/t gold over 23.23 meters from 4.05 meters, including 1.61 g/t over 8.38 meters.
- Phase Two drilling totals 84 holes for 24,312 meters; assays have been reported for 75 holes, with results pending for 9 holes.
- Scorpio Gold flagged about 300 meters of untested strike length remaining along the Zanzibar Formation as it continues step-out drilling across the corridor.
Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Scorpio Gold Corporation published the original content used to generate this news brief via Newsfile (Ref. ID: 202605210500NEWSFILECNPR____20260521_298356_1) on May 21, 2026, and is solely responsible for the information contained therein.
