StrikePoint drills 114.3 m at 0.69 g/t gold at Nevada Hercules project
- StrikePoint Gold reported its best drill intercept by grade-thickness at the Hercules Gold Project in Nevada’s Walker Lane.
- Hole H26-004 cut 114.3 m grading 0.69 g/t gold, 5.03 g/t silver from 135.64 m; mineralization was mainly oxide.
- Higher-grade intervals included 9.14 m of 2.95 g/t gold, 16.18 g/t silver; the hole ended in mineralization.
- Results extend a broad, near-surface oxide zone at the Cliffs target; mineralization remains open to the south.
- Spring 2026 drilling is aimed at supporting a maiden resource estimate targeted for Q4 2026.
Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Strikepoint Gold Inc. published the original content used to generate this news brief via Newsfile (Ref. ID: 202605260730NEWSFILECNPR____20260526_298647_1) on May 26, 2026, and is solely responsible for the information contained therein.
