Xcel-led PowerOn Midwest transmission project seeks Minnesota regulatory approval via certificate of need filing
فورتس إنك
إكسل إنرجي إنك
Fortis Inc. FTS | 0.00 | |
Xcel Energy Inc. XEL | 0.00 |
- Xcel Energy joined Great River Energy and ITC Midwest in filing a Certificate of Need application with the Minnesota Public Utilities Commission for the PowerOn Midwest transmission buildout.
- The project centers on a 765-kV backbone line to expand Upper Midwest grid capacity.
- Developers expect to file a separate facility permit application with the South Dakota Public Utilities Commission in September.
Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Xcel Energy Inc. published the original content used to generate this news brief via Business Wire (Ref. ID: 202605280930BIZWIRE_USPR_____20260528_BW964266) on May 28, 2026, and is solely responsible for the information contained therein.
