Zion Oil & Gas starts sidetrack drilling operations at Megiddo-Jezreel #2 well in Israel

ZION OIL & GAS INC

ZION OIL & GAS INC

ZNOG

0.00

  • Zion Oil & Gas began field operations for a planned sidetrack phase at the Megiddo-Jezreel #2 well in Israel.
  • Work includes re-entering the well, drilling out a temporary plug, conditioning the wellbore, then starting horizontal sidetrack drilling.
  • The drilling rig was recertified, recommissioned, then renamed JB-1 in honor of founder John Brown.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Zion Oil & Gas Inc. published the original content used to generate this news brief via EDGAR, the Electronic Data Gathering, Analysis, and Retrieval system operated by the U.S. Securities and Exchange Commission (Ref. ID: 0001437749-26-020079), on June 10, 2026, and is solely responsible for the information contained therein.