Acciona Energia to build 235-MWp Fleming solar plant in Kentucky, targets May 2028 start-up

  • ACCIONA Energía will build the 235 MWp Fleming solar plant in Fleming County, Kentucky, targeting startup in May 2028.
  • Site work is set to begin in coming weeks, marking the start of construction activity.
  • Project becomes its fifth US photovoltaic plant, lifting its US renewables footprint beyond its current 3 GW installed base.
  • Construction is expected to support up to 300 local jobs at peak, boosting local tax revenues over the operating life.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Corporacion Acciona Energias Renovables SA published the original content used to generate this news brief on July 01, 2026, and is solely responsible for the information contained therein.