Armstrong installs phase-change ceiling tiles at Phoenix distribution center office to curb heat gain
Armstrong World Industries, Inc.
Armstrong World Industries, Inc. AWI | 0.00 |
- Armstrong World Industries products were installed to improve thermal performance at a modular office inside the Phoenix Distribution Center’s unconditioned warehouse.
- Ultima Templok ceiling tiles with R-19 fiberglass batt insulation targeted heat gain through an uninsulated ceiling that pushed office temperatures above 85°F.
- Overnight pre-cooling was used to charge the phase-change ceiling system, reducing daytime cooling load and improving the ability to hold a 78°F setpoint.
Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Armstrong World Industries Inc. published the original content used to generate this news brief on May 28, 2026, and is solely responsible for the information contained therein.
