BlockchAIn Digital Infrastructure signs 15-year 65 MW electric service agreement for CLT-01 campus
Telephone and Data Systems, Inc. TDS | 0.00 | |
Array Digital Infrastructure, Inc. AD | 0.00 | |
BlockchAIn Digital Infrastructure, Inc AIB | 0.00 |
- Blockchain Digital Infrastructure signed a 15-year electric service agreement to expand contracted utility load at its CLT-01 campus to 65 MW from 40 MW.
- The 65 MW is immediately available via existing onsite 34.5 kV infrastructure, avoiding major electrical upgrades and reducing power lead times for AI/HPC capacity.
- The expanded load supports a customer pipeline that includes letters of intent totaling 25 MW of committed critical IT load.
- The power expansion is the first phase of a broader buildout, including an AI-optimized data center shell targeted for completion within nine months.
Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Blockchain Digital Infrastructure Inc. published the original content used to generate this news brief via GlobeNewswire (Ref. ID: 202605270845PRIMZONEFULLFEED9727266) on May 27, 2026, and is solely responsible for the information contained therein.
