Eastport Critical Metals reports uranium intercepts above 200 ppm cutoff at Foley project in Botswana
Critical Metals
EVI Industries, Inc.
Critical Metals CRML | 0.00 | |
EVI Industries, Inc. EVI | 0.00 |
- Eastport reported additional assay results from Fence 2 drilling at its Foley uranium project in Botswana.
- Drilling confirmed shallow, continuous uranium mineralization across two parallel fences about 400 m apart, spanning over 1.4 km of strike.
- Four Fence 2 holes returned intercepts above 200 ppm U3O8, including 6 m at 363.4 ppm with a 1 m interval at 1,319 ppm.
- The mineralized trend sits about 350-750 m north of Lotus Resources’ Letlhakane deposit, supporting a Letlhakane-style paleo-channel model.
- Next work targets additional fences, step-out drilling, and geophysical vectoring to map controls and test for thicker or higher-grade zones.
Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Eastport Critical Metals Corp. published the original content used to generate this news brief on June 24, 2026, and is solely responsible for the information contained therein.
