Fortitude Gold drills 2.23 g/t gold over 4.57 meters near surface at County Line project

FORTITUDE GOLD CORP

FORTITUDE GOLD CORP

FTCO

0.00

  • Fortitude Gold reported near-surface oxide gold drill intercepts that extended mineralization about 100 meters west of the permitted East Pit at County Line.
  • Best result: 4.57 meters grading 2.23 g/t gold within 22.86 meters grading 0.77 g/t, starting 3.05 meters downhole.
  • Additional intercepts included 3.05 meters at 1.57 g/t within 15.24 meters at 0.65 g/t from surface, plus 9.14 meters at 0.92 g/t from surface.
  • County Line began production in January 2026; ore is trucked to the Isabella Pearl heap-leach processing facility.
  • A pit layback at the County Line Main Pit is planned for the second half of 2026 to access additional higher-grade material.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Fortitude Gold Corp. published the original content used to generate this news brief on June 02, 2026, and is solely responsible for the information contained therein.