Gunnison Copper launches up to 120-hole drilling program at Arizona Gunnison project, budgeted at US$15 million

  • Gunnison Copper launched a district-wide drilling program at its Arizona Gunnison Copper Project, including the Strong & Harris satellite deposit.
  • Program targets up to 120 holes totaling 138,000 feet to support resource expansion, metallurgical optimization, resource conversion for a planned pre-feasibility study.
  • Total direct cost estimated at USD 15 million for drilling and lab testing; rig mobilization expected this month.
  • Initial metallurgical phase: up to 36 holes totaling 33,000 feet; up to 270 column leach tests planned over 12 months.
  • Resource drilling to follow with up to 84 holes totaling 105,000 feet; preliminary results expected within six months, full results in 12-15 months.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Gunnison Copper Corp. published the original content used to generate this news brief via Newsfile (Ref. ID: 202606040600NEWSFILECNPR____20260604_300071_1) on June 04, 2026, and is solely responsible for the information contained therein.