Highway 50 Gold starts 5,000-meter drill campaign at Gold Knob project in Nevada
- Highway 50 Gold began a 5,000-meter Phase I drill program at its 100%-owned Gold Knob gold project in north-central Nevada.
- Program targets 10 to 15 holes to extend known mineralization, also testing for a larger gold system at depth.
- Most holes planned at 180 to 425 meters depth, depending on ground conditions.
- Gold mineralization spans Upper-plate Valmy rocks and Lower-plate Comus rocks, traced about 5 km on surface and in prior drilling.
Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Highway 50 Gold Corp. published the original content used to generate this news brief via Newsfile (Ref. ID: 202606181420NEWSFILECNPR____20260618_302110_1) on June 18, 2026, and is solely responsible for the information contained therein.
