Parsons Selected For Design Oversight And Construction Oversight Contracts On Estimated $1.1B-$1.4B Design-Build John A. Blatnik Bridge Project By Minnesota And Wisconsin Departments Of Transportation
Parsons PSN | 0.00 |
Parsons Corporation (NYSE:PSN) announced today that it has been selected for the design oversight and construction oversight contracts on the estimated $1.1 to $1.4 billion design-build John A. Blatnik Bridge Project by the Minnesota and Wisconsin Departments of Transportation. The John A. Blatnik Bridge connects the City of Duluth, Minnesota and Superior, Wisconsin over the Port of Duluth/Superior, which is the most inland ocean vessel harbor in the world and the terminus of the St Lawrence Seaway. Parsons previously provided preliminary engineering design for replacement of the Blatnik Bridge and with this contract will continue their services through design and construction oversight.
