Phillips 66 advances Zeus 300 MMcf/d Permian gas plant project for 2028 startup

Phillips 66

Phillips 66

PSX

0.00

  • Phillips 66 moved forward with the Zeus Gas Plant in the Permian Basin, a 300 MMcf/d gas processing facility aimed at expanding capacity across its wellhead-to-market network.
  • Project scope includes the Midland Express (MEX) Pipeline, a roughly 45-mile, 20-inch line designed to move up to 230 MMcf/d of wellhead gas with future bidirectional flexibility between processing sites.
  • A third Coastal Bend Fractionator in Robstown, Texas, will add 100 MBD of NGL fractionation capacity, supported by purity pipeline expansion and water treatment facilities.
  • Both projects are targeted to start up in 2028.
  • Spending is included within the company’s stated $2 billion to $2.5 billion capital program range.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Phillips 66 published the original content used to generate this news brief via Business Wire (Ref. ID: 202605180700BIZWIRE_USPR_____20260517_BW310811) on May 18, 2026, and is solely responsible for the information contained therein.