Phillips 66 Moves Forward With Zeus Gas Plant And Third Coastal Bend Fractionator, Expanding Gas Processing Capacity In Permian And NGL Fractionation Capabilities On Gulf Coast

Phillips 66

Phillips 66

PSX

0.00

Phillips 66 today announced it is moving forward with the Zeus Gas Plant and a third Coastal Bend Fractionator, two projects that will advance its integrated wellhead-to-market strategy, thereby expanding gas processing capacity in the Permian and NGL fractionation capabilities on the Gulf Coast.

Zeus will be a 300 MMcf/d gas processing facility in the Permian and will include the new Midland Express (MEX) Pipeline, an approximately 45-mile, 20-inch line integrating Phillips 66's Permian Basin gathering systems. Expected to come online with the Zeus processing plant, MEX will be able to move up to 230 MMcf/d of wellhead gas and provide future bi-directional flexibility between multiple processing facilities.

The third Coastal Bend Fractionator, previously referenced as Corpus Christi Fractionator, or BTT2, will be a 100 MBD natural gas liquids (NGL) fractionator in Robstown, Texas, including NGL purity pipeline expansion and water treatment facilities.

Both projects are expected to be online in 2028.