Phillips 66 Moves Forward With Zeus Gas Plant And Third Coastal Bend Fractionator, Expanding Gas Processing Capacity In Permian And NGL Fractionation Capabilities On Gulf Coast
Phillips 66 PSX | 0.00 |
Phillips 66 today announced it is moving forward with the Zeus Gas Plant and a third Coastal Bend Fractionator, two projects that will advance its integrated wellhead-to-market strategy, thereby expanding gas processing capacity in the Permian and NGL fractionation capabilities on the Gulf Coast.
Zeus will be a 300 MMcf/d gas processing facility in the Permian and will include the new Midland Express (MEX) Pipeline, an approximately 45-mile, 20-inch line integrating Phillips 66's Permian Basin gathering systems. Expected to come online with the Zeus processing plant, MEX will be able to move up to 230 MMcf/d of wellhead gas and provide future bi-directional flexibility between multiple processing facilities.
The third Coastal Bend Fractionator, previously referenced as Corpus Christi Fractionator, or BTT2, will be a 100 MBD natural gas liquids (NGL) fractionator in Robstown, Texas, including NGL purity pipeline expansion and water treatment facilities.
Both projects are expected to be online in 2028.
