Reported Earlier, Tesla Signs PPA With Zelestra For Entire Output From 140 MW Lumen Farm Project In Texas
Tesla Motors, Inc.
Tesla Motors, Inc. TSLA | 0.00 |
- Located in northeast Texas, Lumen Farm is anticipated to go into construction in 2027 and achieve full operations in 2029.
- This latest deal expands the global engagement between the two parties, which originated in Spain last year with the agreement of a 57 MWac PPA in the Castilla-La Mancha region
https://zelestra.energy/en/news/tesla-ppa
