Silver Bow Mining reports first drill assays from Rainbow Block project in Montana
Silver Bow Mining Corp.
Silver Bow Mining Corp. SBMT | 0.00 |
- Silver Bow Mining reported initial assay results from the first two holes of its 25,000-foot diamond drill program at Rainbow Block in Butte, Montana.
- SBM26-01 hit mineralization 640-1,980 feet beyond the inferred resource boundary; SBM26-02 extended 930-2,270 feet beyond it.
- Intercepts included 7 feet at 16.1 oz/ton silver; base-metal zones returned up to 11.23% zinc with 9.38 ppm indium.
- Multiple veins fell outside the current inferred resource footprint; some were newly identified, supporting a potential resource expansion strategy.
- Two additional surface drill rigs were mobilized to accelerate step-out drilling along strike through 2026.
Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Silver Bow Mining Corp. published the original content used to generate this news brief via Business Wire (Ref. ID: 20260622167188) on June 22, 2026, and is solely responsible for the information contained therein.
