Stem partners with Copec Flux to deploy PowerTrack EMS at Granja Solar project in Chile
stem inc
stem inc STEM | 0.00 |
- Stem entered a partnership with Copec Flux to deploy PowerTrack EMS at the Granja Solar project in Chile.
- Deployment covers a retrofit of an existing 135 MW solar plant with a 420 MWh battery system to form a utility-scale hybrid facility.
- PowerTrack will act as the site’s master control system, providing monitoring, controls, operational visibility across the integrated assets.
- Companies expect Granja Solar to serve as a reference for additional hybrid projects in Chile, with potential expansion to Colombia.
Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Stem Inc. published the original content used to generate this news brief via Business Wire (Ref. ID: 20260527504963) on May 27, 2026, and is solely responsible for the information contained therein.
