VAALCO restarts Baobab field production offshore Côte d’Ivoire after FPSO refurbishment
VAALCO Energy, Inc.
VAALCO Energy, Inc. EGY | 0.00 |
- VAALCO Energy restarted production at the Baobab field on the CI-40 block offshore Côte d'Ivoire following an FPSO refurbishment.
- The Baobab Ivoirien FPSO halted hydrocarbon operations in January 2025; it returned in early Q2 2026 and was reconnected to field infrastructure.
- Output resumed from four wells; three more producers are expected to come online shortly.
- The refurbishment extends vessel life ahead of a planned Baobab Phase 5 drilling program in H2 2026.
- The program targets four producers, two to three injectors, and two workovers; the CI-40 license runs through 2038.
Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. VAALCO Energy Inc. published the original content used to generate this news brief via GlobeNewswire (Ref. ID: 202606090200PRIMZONEFULLFEED9733702) on June 09, 2026, and is solely responsible for the information contained therein.
